Project #3373 — Mississauga, Ontario
Quick Facts
- Location: Mississauga (Project 3373)
- Duration: ~3.5 weeks
- Service Provided: Kitchen Renovation
- Project Area: ~135 sq ft
Every successful renovation begins long before demolition day.
This Mississauga kitchen project highlights how planning, color coordination, and material selection can transform an outdated space into a bright, modern, and functional kitchen that reflects the homeowner’s vision.
Step 1 — Planning the Renovation
The first stage was a comprehensive planning session where our team discussed the client’s goals — open layout, easy maintenance, and a bright white finish.
We created a scaled 3D design to visualize cabinet placement, lighting, and workflow zones.
Key planning steps included:
- Measuring appliance dimensions and power requirements.
- Mapping plumbing and electrical lines before construction.
- Scheduling permit submissions for ESA electrical inspection.
- Selecting finishes that complemented the condo’s natural lighting.
By finalizing these decisions early, we minimized delays and ensured a smoother build.
Step 2 — Choosing Materials & Coordinating Colors
The homeowner wanted a clean white kitchen with subtle warmth rather than a cold, sterile look.
We combined white cabinetry, quartz surfaces, and soft lighting to achieve balance and harmony.
Material Palette:
- Cabinetry: Matte white lacquer finish, handleless upper doors, and soft-close hardware.
- Countertop: White quartz with faint gray veining for texture.
- Backsplash: Gloss white 3×12 subway tile, reflective under lighting.
- Flooring: Waterproof vinyl plank in “Warm Oak,” introducing gentle contrast.
- Lighting: 3000 K warm-white LED downlights and under-cabinet strips.
This thoughtful color coordination made the space feel open, bright, and comfortable.
Step 3 — Execution & Construction Process
Week 1 – Demolition & Preparation
Removed all existing cabinets and tile flooring. Checked subfloor level and replaced damaged drywall.
Plumbing and electrical lines were repositioned to accommodate the new layout.
Week 2 – Installation & Finishes
Installed waterproof flooring and mounted lower cabinetry first for precision leveling.
New wiring was run for under-cabinet lighting, and LED fixtures were installed with hidden transformers.
Week 3 – Countertops & Lighting Finalization
Quartz countertops and backsplash were set, seams sealed with white silicone.
Lighting scenes were calibrated for both day and evening ambiance.
Final painting and touch-ups completed before homeowner walkthrough.
Total Project Time: ~3.5 weeks.
Before / After Comparison
Before
After
Challenges & Solutions
- Natural light limitation: We used reflective surfaces and warm LEDs to brighten the room without glare.
- Tight cabinet spacing: Adjusted corner cabinet angles to improve flow.
- Color temperature matching: Verified all lights were consistent 3000 K tone to maintain warmth across the space.
- Timeline control: Coordinated countertop fabrication with electrical inspection to avoid downtime.
Investment Range (Guide Only)
A kitchen renovation of this size in Mississauga typically ranges $26 k – $42 k + HST, depending on finish level and appliance upgrades.
Every Reno Mumu project includes:
- Transparent project scheduling.
- Full insurance and WSIB coverage.
- ESA permit and inspection coordination.
- 1-year workmanship warranty.
Request your estimate: Free Quote
Maintenance & Care
- Clean quartz surfaces with mild soap and water.
- Avoid harsh chemicals on matte cabinet finishes.
- Keep lighting diffusers dust-free for even illumination.
- Reseal silicone edges annually to maintain waterproofing.
Explore More Projects
- Browse more Kitchen Renovations
- Learn about Full House Renovation Services
- Start your own Mississauga kitchen project: Get a Free Quote