Project #8 — Woodbridge, Ontario
Quick Facts
- Location: Woodbridge (Project 8)
- Duration: ~2.5 weeks
- Service Provided: Bathroom Renovation
- Project Area: ~100 sq ft
This homeowner in Woodbridge envisioned a calming, minimalist bathroom that feels bright and open.
Reno Mumu delivered a complete transformation featuring a sculptural stand-alone bathtub, a sleek LED mirror cabinet, and high-gloss white porcelain floor tiles that visually expand the space.
The project was completed in just 2½ weeks, balancing aesthetic precision with practical performance.
Design Goals
- Freestanding bathtub as the centerpiece of the layout.
- LED mirror cabinet providing both storage and soft ambient light.
- Glossy white porcelain flooring for reflection and easy cleaning.
- Neutral palette combining white, champagne gold, and warm gray tones.
- Enhanced ventilation and waterproofing to ensure long-term reliability.
Materials & Specifications
Bathtub & Fixtures
- 59″ stand-alone acrylic tub with slim edge profile and floor-mounted tub filler.
- Champagne-gold faucet set, single-lever mixer, and handheld wand.
- Hidden drain and overflow system for minimalist aesthetics.
Vanity & Mirror Cabinet
- 48″ wall-hung vanity in light ash veneer with quartz countertop.
- LED mirror cabinet with dual-tone lighting (warm / neutral white).
- Soft-close mirrored doors with built-in outlets and defogger.
- Matte-black handles for modern contrast.
Floor & Wall Finishes
- 24×48 glossy white porcelain floor tiles, rectified, mirror-smooth surface.
- Wall tiles: 12×24 matte porcelain, soft gray for balanced tone.
- Waterproofing: cement backer + liquid membrane with full-height coverage.
- Grout: bright white, sealed for stain resistance.
Lighting & Electrical
- Ceiling recessed LEDs (3500 K) for even brightness.
- Dedicated GFCI circuit for vanity zone.
- Smart humidity-sensor fan with timer shutoff.
Process & Timeline
Week 1 — Demolition & Rough-Ins
Removed existing alcove tub and vanity.
Re-routed plumbing to center the freestanding tub and added power supply for the LED mirror cabinet.
Week 2 — Waterproofing & Tiling
Applied liquid membrane, installed 24×48 floor tiles with tight alignment, and set wall tile layout with laser precision.
Half Week 3 — Installation & Finishing
Mounted LED mirror cabinet, vanity, and stand-alone tub.
Installed trims, grouted, sealed joints, and performed ESA electrical verification.
Total duration: ~2.5 weeks.
After / Completed Project Photos
1. Stand-Alone Tub — Centerpiece of the Room
2. Vanity Zone — LED Mirror Cabinet & Quartz Top
3. Flooring — Glossy White Porcelain Tiles
4. Overall View — Bright and Minimalist Design
Challenges & Solutions
- Plumbing relocation: adjusted in-floor drain lines to accommodate freestanding tub without raising floor height.
- Tile alignment: large 24×48 floor tiles required precision laser-leveling to maintain continuous reflection lines.
- Electrical routing: concealed wiring for mirror cabinet and ceiling LEDs for a clean wall finish.
- Moisture resistance: used two-layer waterproofing and color-matched silicone at all change-of-plane joints.
Investment Range (Guide Only)
A bathroom renovation of this scope in Woodbridge generally ranges $20 k – $32 k + HST, depending on tub model, lighting system, and tile selection.
Request a clear, itemized estimate here: Free Quote.
Maintenance Tips
- Wipe glossy floor tiles and tub after use to maintain shine.
- Use mild cleaners; avoid acidic products that dull quartz or glaze.
- Keep fan running 20 minutes post-shower to manage humidity.
- Reseal grout and silicone annually for best longevity.
Explore More Projects
- View other Bathroom Renovations
- Learn about our House Renovation Services
- Plan your own Woodbridge project: Get a Free Quote