Project #1981 — Mississauga, Ontario
Quick Facts
- Location: Mississauga (Project 1981)
- Duration: < 3 weeks
- Service Provided: Bathroom Renovation
- Project Area: ~90 sq ft
Homeowners in Mississauga wanted a small bathroom transformation that delivered a luxury feel within a short timeframe.
Reno Mumu designed a layout centered around elegant gold faucet fixtures, clean white quartz, and soft neutral tones to make the space feel open, warm, and refined.
The entire renovation — from demolition to handover — was completed in under three weeks, blending speed, precision, and high-end craftsmanship.
Design Goals
- Highlight gold accents: faucets, shower trim, and cabinet hardware as visual focus points.
- Maximize light: install frameless 10 mm glass and bright porcelain tiles for reflection.
- Functional luxury: quartz vanity top with under-mount sink and storage drawers.
- Modern illumination: LED mirror with adjustable brightness and anti-fog feature.
- Efficient ventilation: quiet fan with humidity sensor to maintain comfort.
Materials & Specifications
Plumbing Fixtures
- Faucet set: brushed-gold finish, solid brass body, ceramic cartridge.
- Shower trim: gold thermostatic mixer, rain head + hand shower combo.
- Drain & accessories: matching gold linear drain, towel bar, and hooks.
Vanity & Countertop
- 42″ floating vanity in matte ivory lacquer.
- Quartz countertop: white with subtle veining, eased edge, under-mount sink.
- Gold drawer pulls to complement faucet tone.
Tiles & Surfaces
- 24×48 polished porcelain wall tile, 2×2 mosaic floor tile.
- Waterproofing: cement board + liquid membrane, reinforced at corners.
- Grout color: warm ivory for seamless joints.
Lighting & Electrical
- LED round mirror (600 mm) with touch dimmer.
- Ceiling recessed LED (4000 K neutral tone).
- GFCI-protected vanity outlet.
Process & Timeline
Week 1 – Demolition & rough-in
Removed old fixtures and drywall. Reframed niche, relocated drain, and prepared plumbing for gold-finish trim set.
Week 2 – Waterproofing & tiling
Applied waterproof membrane, tiled walls and floor, installed quartz sill and niche edge.
Week 3 – Fixtures & final finishing
Mounted vanity, faucet, shower glass, and LED mirror. Completed grouting, silicone, and full clean-up before client walkthrough.
Total duration: approx. 2 weeks + 3 days.
After / Completed Project Photos
1. Vanity — Faucet and Quartz Top
2. Shower — Gold Trim & Frame Mirror
3. Details — Gold Hardware & Lighting Harmony
4. Overall View — Compact Modern Bathroom
Challenges & Solutions
- Tight schedule: optimized material lead time and daily milestone tracking to ensure handover within 3 weeks.
- Fixture matching: coordinated gold tones across faucet, trim, and accessories to ensure consistent hue.
- Compact layout: wall-mounted vanity and frameless glass increased floor visibility and space perception.
- Moisture control: fan upgrade + vapor barrier reduced condensation risk in the small footprint.
Investment Range (Guide Only)
For a Mississauga bathroom of this scale and quality, budgets typically range $18 k – $27 k + HST, depending on tile selection, faucet brand, and lighting upgrades.
Request a transparent estimate: Free Quote.
Maintenance Tips
- Clean gold fixtures weekly with a mild pH-neutral cleaner; avoid abrasives.
- Wipe LED mirror and glass after each shower to maintain clarity.
- Re-seal quartz edges and grout annually.
- Keep fan running 15–20 minutes after use for optimal humidity control.
Explore More Projects
- Browse Bathroom Projects
- Learn about House Renovation Services
- Ready to renovate your own bathroom? Get a Free Quote