Project — East York Roof Renovation
Quick Facts
- Location: East York Roof Renovation
- Service: Roof Renovation
- Duration: ~1.5 weeks
- Scope: Design, materials, installation, and final inspection.
Goals
- Watertight roofing with ice-and-water shield at eaves and valleys.
- Balanced attic ventilation to prolong shingle life.
- Code-compliant flashing around penetrations.
- Clean site and safe disposal of old materials.
Materials & Specifications
- Underlayment: synthetic + ice-and-water shield in critical zones.
- Shingles: architectural asphalt or metal as specified.
- Flashing: pre-painted metal at chimneys/vents/skylights.
- Ventilation: ridge + intake vents sized per code.
Process & Timeline
- Stage 1 — Tear-off & inspect decking.
- Stage 2 — Underlayment & flashing install.
- Stage 3 — Shingle/metal install & site clean-up.
Completed Project Photos
Tips & Care
- Confirm attic insulation and vapor control under the roof deck.
- Schedule work in dry weather windows when possible.