Skip to main content
Contact call us Quote
38 Woodbridge staircase renovation project cover image

Staircase Renovation — 38 Woodbridge

Floor & Staircase · ·Updated Oct 29, 2025 · 38 Woodbridge

38 Woodbridge staircase renovation with new treads, risers, handrails, and safe code-compliant details. Durable finishes and modern style.

Project — 38 Woodbridge

Quick Facts

  • Location: 38 Woodbridge
  • Service: Staircase Renovation
  • Duration: ~3 weeks
  • Scope: Design, materials, installation, and final inspection.

Goals

  • Upgrade treads, risers, and handrails for safety and style.
  • Color-match stain with adjacent flooring for continuity.
  • Code-compliant railing height and baluster spacing.
  • Durable finishes to resist wear on high-traffic steps.
  • Optional LED step lighting for nighttime safety.

Materials & Specifications

  • Treads/Risers: solid oak treads; painted or stained risers.
  • Railing: wood or metal with code spacing; secure newel posts.
  • Finish: low-VOC stain + catalyzed top coat for durability.
  • Transitions: seamless nosing to match flooring; anti-squeak shims.

Process & Timeline

  • Day 1–2 — Protection & demo: protect floors, remove old treads and rails.
  • Day 3–4 — Carpentry: install new treads/risers; set posts and handrails.
  • Day 5–7 — Finish: sand, stain, top-coat; fit trims and touch-ups.

Completed Project Photos

Project result 1

Project result 2

Tips & Care

  • Confirm tread overhang and riser uniformity for comfort.
  • Pre-finish parts off-site to minimize odor/time on site.
  • Add anti-slip strips or finish with satin sheen for grip.