Quick Facts
- Location: 38 Woodbridge
- Service: Staircase Renovation
- Duration: ~3 weeks
- Scope: Design, materials, installation, and final inspection.
Goals
- Upgrade treads, risers, and handrails for safety and style.
- Color-match stain with adjacent flooring for continuity.
- Code-compliant railing height and baluster spacing.
- Durable finishes to resist wear on high-traffic steps.
- Optional LED step lighting for nighttime safety.
Materials & Specifications
- Treads/Risers: solid oak treads; painted or stained risers.
- Railing: wood or metal with code spacing; secure newel posts.
- Finish: low-VOC stain + catalyzed top coat for durability.
- Transitions: seamless nosing to match flooring; anti-squeak shims.
Process & Timeline
- Day 1–2 — Protection & demo: protect floors, remove old treads and rails.
- Day 3–4 — Carpentry: install new treads/risers; set posts and handrails.
- Day 5–7 — Finish: sand, stain, top-coat; fit trims and touch-ups.
Completed Project Photos
Tips & Care
- Confirm tread overhang and riser uniformity for comfort.
- Pre-finish parts off-site to minimize odor/time on site.